Skip to main content
foodservicenerd
Local permits & fees

Washington County, UT Food Facility Permits & Fees

Restaurants and food trucks.

Southwest Utah Public Health Department (SWUPHD) · department site →
Fees change often — always confirm the current amount with the department before you budget.

Washington County food-facility health permits run about $220–$660 annually, depending on size or sales volume. Plan review runs about $400–$660. Confirm the exact amount with Southwest Utah Public Health Department (SWUPHD) before you budget.

Confirm the authority for your exact address. Some cities run their own health division, and building, planning, fire, sewer/grease and business-license approvals are separate even when Southwest Utah Public Health Department (SWUPHD) issues the health permit.

The restaurant market in Washington County

What the local foodservice landscape looks like — useful whether you’re opening here or sizing up the competition.

395
food & drink establishments
8,528
industry jobs
$178M
annual payroll
$20,927
avg wage / worker
  • 126 full-service restaurants
  • 176 limited-service & fast food
  • 5 bars & drinking places
  • 57 snack & coffee bars
  • 17 mobile food & trucks

▲ 7.3% change in establishments since 2022 (368 → 395).

The average foodservice wage here is $225 below the Utah average ($21,152); Utah has about 6,174 food & drink establishments statewide.

Source: U.S. Census Bureau, County Business Patterns 2023 (NAICS 722, food services & drinking places) — establishments with paid employees. Some small-county payroll figures are withheld by Census for confidentiality.

Last verified: 2026-08-17 — we re-confirmed the serving authority, its contact, and that the fees below match the current published schedule. Fee schedules may carry an earlier effective date (shown per fee); local ordinances & amendments aren’t individually reviewed, so confirm current rules with the authority having jurisdiction.See something out of date? Report an update →

Restaurant / food-facility permit

Food Establishment Permit (by risk category)
$220 (Risk Cat 1), $325 (Risk Cat 2), $450 (Risk Cat 3), $660 (Risk Cat 4) per year

Annual permit priced by food-safety risk category; Fee schedule effective May 1, 2026. A $220 Conditional Permit is also available; Food Handler card $25 (valid 3 yrs)

Plan review — required

  • $400 (Risk Cat 1 or 2)
  • $660 (Risk Cat 3 or 4)

Plan-review details & forms →

Reach the department

Office620 S 400 E, St. George, UT 84770

Inspection grading

Routine inspection — no public letter grade

Utah has no statewide grading; Southwest Utah Public Health posts inspection reports online.

Food truck / mobile permit

Mobile Food Establishment (Primary) Permit
  • $350 (Tier 1) or $500 (Tier 2) per year
  • plus $380 mobile plan review

Tier reflects menu complexity/risk; St; George/Washington County food-truck line (435) 986-2584

How to apply

Fees/payment and forms are on the department site; application steps vary by concept — see the checklist below.

What it costs in permit fees to open here

The government permit & plan-review fees below total roughly $970–$1,820 for Washington County:

  • $220–$660 — food-facility permit
  • $400–$660 — plan review
  • $350–$500 — food-truck permit

That’s the paperwork only. Add buildout, equipment, deposits and licenses with the cost-to-open calculator. Fees change — confirm current amounts with the department.

How Washington County’s permit cost compares

At about $220/year, Washington County’s restaurant health permit is below the Utah median ($250) and above the U.S. median ($125) — higher than about 78% of U.S. counties.
Ranked 13th-lowest of 29 Utah counties by permit cost.

Comparison uses the lowest published annual restaurant-permit figure in each county; confirm your exact tier with the department.

Local food-service market

About 368 food & drinking establishments serve ~202,452 residents in Washington County — one per ~550 residents, denser than the Utah average (one per ~589).

U.S. Census 2023 population; County Business Patterns 2022 (NAICS 722).

Budget the permit stack

Start with ~$220 annual health permit + $400 plan review.

Plus building, fire, and business-license fees that vary locally — use the cost calculators and the checklist below to budget the full stack.

Grease trap & FOG requirements

Under IPC, food establishments here must control fats, oils & grease (FOG) with a grease interceptor or trap, and typically register with the local sewer/wastewater authority. A grease interceptor sized to the state plumbing code is required, with a municipal sewer-authority FOG discharge permit.

Size the interceptor with our grease-trap sizing calculator, compare units in the grease-trap catalog, and confirm the local FOG permit with Southwest Utah Public Health Department (SWUPHD) (contact above).

Fire suppression & backflow

Hood fire suppression (IFC): commercial cooking under a Type I hood needs a wet-chemical suppression system to NFPA 96, permitted and inspected by the local fire marshal. Commercial hood suppression must meet NFPA 96 and the state fire code enforced by local fire officials. See do I need a hood? and the hood CFM calculator.

Backflow prevention: An approved backflow preventer with a certified annual test is required by the local water purveyor. A certified backflow assembly (often an RPZ) on the water service, tested annually, is standard — confirm with your water utility.

Watch out for

  • Full published fee schedule effective May 1, 2026 (swuhealth.gov/fees)
  • SWUPHD serves five SW Utah counties incl; Washington County (St; George); office at 620 S 400 E, St; George
  • Institution permit $190; School Kitchen $270; Home Daycare (limited inspection) $130
  • Utah state rule caps the food-handler permit fee at $15 to a local health dept, but SWUPHD's food-handler CARD/training is $25 (valid 3 years)

Other food-service permits in this jurisdiction

CategoryAnnual feeNotes
Temporary / seasonal event$60 (single event, Risk/Tier 1) or $85 (single event, Risk/Tier 2), each +$25 if issued on-site; $125 (seasonal 6-month, Tier 1) or $180 (seasonal 6-month, Tier 2)SWUPHD fee schedule effective May 1, 2026
Pushcart / mobile vending$350 (Mobile Primary, Tier 1) or $500 (Mobile Primary, Tier 2) per year; plus $380 mobile plan reviewTier reflects menu/risk complexity

Equipment your Washington County plan review will check

Health-department plan review looks for specific, code-compliant fixtures. Compare spec-filtered options, then confirm counts and sizes with your local requirements. See the full list in what equipment a commercial kitchen requires.

Nearby counties

Permit costs and rules change at the county line — compare Washington County with its neighbors.

How to open: typical permitting sequence

This is a typical sequence — confirm the exact sequence with your authority having jurisdiction.

  1. Confirm whether Washington County or another local jurisdiction (city/district) handles your exact address.
  2. Confirm zoning and permitted use.
  3. Prepare your menu and scaled plans.
  4. Include an equipment schedule with ANSI/NSF spec sheets.
  5. Submit water-heater and hood documentation.
  6. Pay plan-review fees.
  7. Respond to plan-check corrections.
  8. Obtain Environmental Health plan approval.
  9. Obtain building, plumbing, mechanical and fire approvals.
  10. Schedule rough-plumbing, pre-final and final health inspections.
  11. Pay the operating-permit / application fees.
  12. Receive approval before storing or preparing food.

Official plan-check requirements: plan-check guide →

Frequently asked questions

How much is a food permit in Washington County?

$220 (Risk Cat 1), $325 (Risk Cat 2), $450 (Risk Cat 3), $660 (Risk Cat 4) per year These are annual health-permit fees, usually tiered by seating or size; confirm your exact category with the department.

Is plan review required in Washington County?

Yes — plan review is required before you build or remodel a food facility. Typical fees: $400 (Risk Cat 1 or 2); $660 (Risk Cat 3 or 4)

Do I need a commissary for a food truck in Washington County?

In most cases, yes — most mobile units must operate from an approved commissary; confirm exemptions with the department. Tier reflects menu complexity/risk; St; George/Washington County food-truck line (435) 986-2584

Who issues food permits in Washington County?

Food permits here are issued by Southwest Utah Public Health Department (SWUPHD). See the department site for current details.

Are city building and fire approvals separate?

Yes — building, plumbing, mechanical and fire approvals are always separate from the health permit and are often handled by different offices.
Sources: swuhealth.gov · swuhealth.gov · observed 2026-08-07