Skip to main content
foodservicenerd
Local permits & fees

Pike County, OH Food Facility Permits & Fees

Restaurants and food trucks.

Pike County General Health District · department site →
Fees change often — always confirm the current amount with the department before you budget.

Confirm the authority for your exact address. Some cities run their own health division, and building, planning, fire, sewer/grease and business-license approvals are separate even when Pike County General Health District issues the health permit.

The restaurant market in Pike County

What the local foodservice landscape looks like — useful whether you’re opening here or sizing up the competition.

43
food & drink establishments
706
industry jobs
$12M
annual payroll
$16,972
avg wage / worker
  • 12 full-service restaurants
  • 18 limited-service & fast food
  • 4 bars & drinking places
  • 8 snack & coffee bars

▲ 16.2% change in establishments since 2022 (37 → 43).

The average foodservice wage here is $3,656 below the Ohio average ($20,628); Ohio has about 24,162 food & drink establishments statewide.

Source: U.S. Census Bureau, County Business Patterns 2023 (NAICS 722, food services & drinking places) — establishments with paid employees. Some small-county payroll figures are withheld by Census for confidentiality.

Last verified: 2026-08-18 — we re-confirmed the serving authority, its contact, and that the fees below match the current published schedule. Fee schedules may carry an earlier effective date (shown per fee); local ordinances & amendments aren’t individually reviewed, so confirm current rules with the authority having jurisdiction.See something out of date? Report an update →

Restaurant / food-facility permit

Food Service Operation License
  • FSO/RFE annual license (Commercial), Chart B, plus $28 state fee: Small <
  • 25,000 sq ft Risk II $218, III $372, IV $462
  • Large >
  • 25,000 sq ft Risk I $268, II $922

From FSO/RFE Plan Review Packet Chart B (Waverly, OH); Phone 740-947-7721. Some risk-level rows in the source PDF were not fully legible; Risk I Small and Risk III-IV Large not captured

Plan review — required

50% of the health department license fee

Reach the department

Office116 S. Market Street, Waverly, OH 45690

Inspection grading

How inspection results are scored/posted here is pending verification — ask the department.

Food truck / mobile permit

Mobile Food Service Operation License
Fee not published online — contact the department.

Separate Mobile Plan Review packet; fee not captured

How to apply

See the department site above.

Fees/payment and forms are on the department site; application steps vary by concept — see the checklist below.

What it costs in permit fees to open here

The government permit & plan-review fees below total roughly $28–$922 for Pike County:

  • $28–$922 — food-facility permit

That’s the paperwork only. Add buildout, equipment, deposits and licenses with the cost-to-open calculator. Fees change — confirm current amounts with the department.

Local food-service market

About 37 food & drinking establishments serve ~27,001 residents in Pike County — one per ~730 residents, sparser than the Ohio average (one per ~574).

U.S. Census 2023 population; County Business Patterns 2022 (NAICS 722).

Grease trap & FOG requirements

Under Ohio Plumbing Code (based on 2021 IPC), food establishments here must control fats, oils & grease (FOG) with a grease interceptor or trap, and typically register with the local sewer/wastewater authority. Grease interceptors are required under the Ohio Plumbing Code, with FOG discharge limits enforced by the local sewer authority.

Size the interceptor with our grease-trap sizing calculator, compare units in the grease-trap catalog, and confirm the local FOG permit with Pike County General Health District (contact above).

Fire suppression & backflow

Hood fire suppression (Ohio Fire Code (based on 2021 IFC)): commercial cooking under a Type I hood needs a wet-chemical suppression system to NFPA 96, permitted and inspected by the local fire marshal. Commercial kitchen hood suppression follows NFPA 96 as adopted in the Ohio Fire Code and is inspected by the local fire authority. See do I need a hood? and the hood CFM calculator.

Backflow prevention: Restaurants must install a testable backflow preventer (typically an RPZ) that is tested annually and reported to the local water utility. A certified backflow assembly (often an RPZ) on the water service, tested annually, is standard — confirm with your water utility.

Equipment your Pike County plan review will check

Health-department plan review looks for specific, code-compliant fixtures. Compare spec-filtered options, then confirm counts and sizes with your local requirements. See the full list in what equipment a commercial kitchen requires.

Nearby counties

Permit costs and rules change at the county line — compare Pike County with its neighbors.

How to open: typical permitting sequence

This is a typical sequence — confirm the exact sequence with your authority having jurisdiction.

  1. Confirm whether Pike County or another local jurisdiction (city/district) handles your exact address.
  2. Confirm zoning and permitted use.
  3. Prepare your menu and scaled plans.
  4. Include an equipment schedule with ANSI/NSF spec sheets.
  5. Submit water-heater and hood documentation.
  6. Pay plan-review fees.
  7. Respond to plan-check corrections.
  8. Obtain Environmental Health plan approval.
  9. Obtain building, plumbing, mechanical and fire approvals.
  10. Schedule rough-plumbing, pre-final and final health inspections.
  11. Pay the operating-permit / application fees.
  12. Receive approval before storing or preparing food.

Frequently asked questions

How much is a food permit in Pike County?

FSO/RFE annual license (Commercial), Chart B, plus $28 state fee: Small <25,000 sq ft Risk II $218, III $372, IV $462; Large >25,000 sq ft Risk I $268, II $922 These are annual health-permit fees, usually tiered by seating or size; confirm your exact category with the department.

Is plan review required in Pike County?

Yes — plan review is required before you build or remodel a food facility. Typical fees: 50% of the health department license fee

Do I need a commissary for a food truck in Pike County?

In most cases, yes — most mobile units must operate from an approved commissary; confirm exemptions with the department. Separate Mobile Plan Review packet; fee not captured

Who issues food permits in Pike County?

Food permits here are issued by Pike County General Health District. See the department site for current details.

Are city building and fire approvals separate?

Yes — building, plumbing, mechanical and fire approvals are always separate from the health permit and are often handled by different offices.
Sources: pike-health.com · pike-health.com · observed 2026-08-21