Skip to main content
foodservicenerd
Local permits & fees

Washington County, WI Food Facility Permits & Fees

Restaurants and food trucks.

Washington Ozaukee Public Health Department · department site →
Fees change often — always confirm the current amount with the department before you budget.

Washington County food-facility health permits run about $160–$830 annually, depending on size or sales volume. Plan review runs about $130–$770. Confirm the exact amount with Washington Ozaukee Public Health Department before you budget.

Confirm the authority for your exact address. Some cities run their own health division, and building, planning, fire, sewer/grease and business-license approvals are separate even when Washington Ozaukee Public Health Department issues the health permit.

The restaurant market in Washington County

What the local foodservice landscape looks like — useful whether you’re opening here or sizing up the competition.

272
food & drink establishments
4,602
industry jobs
$84M
annual payroll
$18,210
avg wage / worker
  • 93 full-service restaurants
  • 95 limited-service & fast food
  • 47 bars & drinking places
  • 19 snack & coffee bars
  • 4 mobile food & trucks

▼ 1.1% change in establishments since 2022 (275 → 272).

The average foodservice wage here is $2,130 below the Wisconsin average ($20,340); Wisconsin has about 13,939 food & drink establishments statewide.

Source: U.S. Census Bureau, County Business Patterns 2023 (NAICS 722, food services & drinking places) — establishments with paid employees. Some small-county payroll figures are withheld by Census for confidentiality.

Last verified: 2026-08-18 — we re-confirmed the serving authority, its contact, and that the fees below match the current published schedule. Fee schedules may carry an earlier effective date (shown per fee); local ordinances & amendments aren’t individually reviewed, so confirm current rules with the authority having jurisdiction.See something out of date? Report an update →

Restaurant / food-facility permit

Retail Serving Meals License
Annual license:
Prepacked/Tavern $160, Simple $354, Moderate $508, Complex $830

2026 WOPHD Fee Schedule (department serves both Washington and Ozaukee counties; Washington, WISCONSIN); 'Additional area' $112; Consultation fee $245. Retail Food Not Serving Meals: Simple Non-TCS $170, Simple TCS $438, Moderate $570, Complex $1,370

Plan review — required

Preinspection fee:
Prepacked/Tavern $130, Simple $320, Moderate $470, Complex $770

Reach the department

OfficeWashington Ozaukee Public Health Department, 333 E Washington St, Suite 1100, West Bend, WI 53095

Inspection grading

How inspection results are scored/posted here is pending verification — ask the department.

Food truck / mobile permit

Mobile / Transient (Retail Serving Meals & Mobile & Service Base)
Transient serving meals:
  • Annual $190, 1-week $105
  • Set-up fee (transient and mobile) $70

Mobiles included in the 'Retail Serving Meals & Mobile & Service Base' complexity categories

How to apply

See the department site above.

Fees/payment and forms are on the department site; application steps vary by concept — see the checklist below.

What it costs in permit fees to open here

The government permit & plan-review fees below total roughly $360–$1,790 for Washington County:

  • $160–$830 — food-facility permit
  • $130–$770 — plan review
  • $70–$190 — food-truck permit

That’s the paperwork only. Add buildout, equipment, deposits and licenses with the cost-to-open calculator. Fees change — confirm current amounts with the department.

How Washington County’s permit cost compares

At about $160/year, Washington County’s restaurant health permit is above the Wisconsin median ($159) and above the U.S. median ($125) — higher than about 67% of U.S. counties.
Ranked 12th-lowest of 18 Wisconsin counties by permit cost.

Comparison uses the lowest published annual restaurant-permit figure in each county; confirm your exact tier with the department.

Local food-service market

About 275 food & drinking establishments serve ~138,168 residents in Washington County — one per ~502 residents, sparser than the Wisconsin average (one per ~430).

U.S. Census 2023 population; County Business Patterns 2022 (NAICS 722).

Budget the permit stack

Start with ~$160 annual health permit + $130 plan review.

Plus building, fire, and business-license fees that vary locally — use the cost calculators and the checklist below to budget the full stack.

Grease trap & FOG requirements

Under Wisconsin Plumbing Code (SPS 382), food establishments here must control fats, oils & grease (FOG) with a grease interceptor or trap, and typically register with the local sewer/wastewater authority. Grease interceptors are required under the Wisconsin plumbing code, with FOG limits set by the municipal sewer utility.

Size the interceptor with our grease-trap sizing calculator, compare units in the grease-trap catalog, and confirm the local FOG permit with Washington Ozaukee Public Health Department (contact above).

Fire suppression & backflow

Hood fire suppression (Wisconsin adopts the IFC via SPS 314): commercial cooking under a Type I hood needs a wet-chemical suppression system to NFPA 96, permitted and inspected by the local fire marshal. Commercial kitchen hood suppression follows NFPA 96 as adopted through Wisconsin's fire and building codes, inspected by the local fire authority. See do I need a hood? and the hood CFM calculator.

Backflow prevention: Restaurants must install a testable backflow preventer (typically an RPZ) that is tested annually and reported to the local water utility. A certified backflow assembly (often an RPZ) on the water service, tested annually, is standard — confirm with your water utility.

Equipment your Washington County plan review will check

Health-department plan review looks for specific, code-compliant fixtures. Compare spec-filtered options, then confirm counts and sizes with your local requirements. See the full list in what equipment a commercial kitchen requires.

Nearby counties

Permit costs and rules change at the county line — compare Washington County with its neighbors.

How to open: typical permitting sequence

This is a typical sequence — confirm the exact sequence with your authority having jurisdiction.

  1. Confirm whether Washington County or another local jurisdiction (city/district) handles your exact address.
  2. Confirm zoning and permitted use.
  3. Prepare your menu and scaled plans.
  4. Include an equipment schedule with ANSI/NSF spec sheets.
  5. Submit water-heater and hood documentation.
  6. Pay plan-review fees.
  7. Respond to plan-check corrections.
  8. Obtain Environmental Health plan approval.
  9. Obtain building, plumbing, mechanical and fire approvals.
  10. Schedule rough-plumbing, pre-final and final health inspections.
  11. Pay the operating-permit / application fees.
  12. Receive approval before storing or preparing food.

Frequently asked questions

How much is a food permit in Washington County?

Annual license: Prepacked/Tavern $160, Simple $354, Moderate $508, Complex $830 These are annual health-permit fees, usually tiered by seating or size; confirm your exact category with the department.

Is plan review required in Washington County?

Yes — plan review is required before you build or remodel a food facility. Typical fees: Preinspection fee: Prepacked/Tavern $130, Simple $320, Moderate $470, Complex $770

Do I need a commissary for a food truck in Washington County?

In most cases, yes — most mobile units must operate from an approved commissary; confirm exemptions with the department. Mobiles included in the 'Retail Serving Meals & Mobile & Service Base' complexity categories

Who issues food permits in Washington County?

Food permits here are issued by Washington Ozaukee Public Health Department. See the department site for current details.

Are city building and fire approvals separate?

Yes — building, plumbing, mechanical and fire approvals are always separate from the health permit and are often handled by different offices.
Sources: washozwi.gov · washozwi.gov · observed 2026-08-21