Fees change often — always confirm the current amount with the department before you budget.
Grant County food-facility health permits run about $336–$1,010 annually, depending on size or sales volume. Confirm the exact amount with Grant County Health District before you budget.
Confirm the authority for your exact address. Some cities run their own health division, and building, planning, fire, sewer/grease and business-license approvals are separate even when Grant County Health District issues the health permit.
The restaurant market in Grant County
What the local foodservice landscape looks like — useful whether you’re opening here or sizing up the competition.
194
food & drink establishments
2,179
industry jobs
$56M
annual payroll
$25,660
avg wage / worker
65 full-service restaurants
65 limited-service & fast food
8 bars & drinking places
43 snack & coffee bars
3 mobile food & trucks
▲ 7.2% change in establishments since 2022 (181 → 194).
The average foodservice wage here is $5,012 below the Washington average ($30,672); Washington has about 17,386 food & drink establishments statewide.
Source: U.S. Census Bureau, County Business Patterns 2023 (NAICS 722, food services & drinking places) — establishments with paid employees. Some small-county payroll figures are withheld by Census for confidentiality.
Last verified: 2026-08-18 — we re-confirmed the serving authority, its contact, and that the fees below match the current published schedule. Fee schedules may carry an earlier effective date (shown per fee); local ordinances & amendments aren’t individually reviewed, so confirm current rules with the authority having jurisdiction.See something out of date? Report an update →
Restaurant / food-facility permit
Annual Food Service Permit
Risk Level 1 $336
Level 2 $674
Level 3 $1,010 (annual)
Tiered by risk level (risk-factor points); New 2026 fee schedule effective July 9, 2026 (Ordinance 2025-02)
How inspection results are scored/posted here is pending verification — ask the department.
Food truck / mobile permit
Mobile Food Unit
Risk Level 1 $252
Level 2 $504
Level 3 $756 (annual)
Tiered by risk level
How to apply
See the department site above.
Fees/payment and forms are on the department site; application steps vary by concept — see the checklist below.
What it costs in permit fees to open here
The government permit & plan-review fees below total roughly $588–$1,766 for Grant County:
$336–$1,010 — food-facility permit
$252–$756 — food-truck permit
That’s the paperwork only. Add buildout, equipment, deposits and licenses with the cost-to-open calculator. Fees change — confirm current amounts with the department.
How Grant County’s permit cost compares
At about $336/year, Grant County’s restaurant health permit is above the Washington median ($292) and above the U.S. median ($125) — higher than about 94% of U.S. counties.
Ranked 21st-lowest of 30 Washington counties by permit cost.
Comparison uses the lowest published annual restaurant-permit figure in each county; confirm your exact tier with the department.
Local food-service market
About 181 food & drinking establishments serve ~102,678 residents in Grant County — one per ~567 residents, sparser than the Washington average (one per ~521).
U.S. Census 2023 population; County Business Patterns 2022 (NAICS 722).
Budget the permit stack
Start with ~$336 annual health permit.
Plus building, fire, and business-license fees that vary locally — use the cost calculators and the checklist below to budget the full stack.
Grease trap & FOG requirements
Under UPC, food establishments here must control fats, oils & grease (FOG) with a grease interceptor or trap, and typically register with the local sewer/wastewater authority. A grease interceptor sized to the state plumbing code is required, with a municipal sewer-authority FOG discharge permit.
Hood fire suppression (IFC): commercial cooking under a Type I hood needs a wet-chemical suppression system to NFPA 96, permitted and inspected by the local fire marshal. Type I hood fire suppression must meet NFPA 96 and the state fire code enforced by the local fire authority. See do I need a hood? and the hood CFM calculator.
Backflow prevention: An approved backflow preventer with a certified annual test is required by the local water purveyor. A certified backflow assembly (often an RPZ) on the water service, tested annually, is standard — confirm with your water utility.
Equipment your Grant County plan review will check
Health-department plan review looks for specific, code-compliant fixtures. Compare spec-filtered options, then confirm counts and sizes with your local requirements. See the full list in what equipment a commercial kitchen requires.
This is a typical sequence — confirm the exact sequence with your authority having jurisdiction.
Confirm whether Grant County or another local jurisdiction (city/district) handles your exact address.
Confirm zoning and permitted use.
Prepare your menu and scaled plans.
Include an equipment schedule with ANSI/NSF spec sheets.
Submit water-heater and hood documentation.
Pay plan-review fees.
Respond to plan-check corrections.
Obtain Environmental Health plan approval.
Obtain building, plumbing, mechanical and fire approvals.
Schedule rough-plumbing, pre-final and final health inspections.
Pay the operating-permit / application fees.
Receive approval before storing or preparing food.
Frequently asked questions
How much is a food permit in Grant County?
Risk Level 1 $336; Level 2 $674; Level 3 $1,010 (annual) These are annual health-permit fees, usually tiered by seating or size; confirm your exact category with the department.
Is plan review required in Grant County?
Yes — plan review is required before you build or remodel a food facility. Typical fees: Field plan review = 1/2 annual fee; menu review = 1/4 annual fee; structure/equipment review = 1/4 annual fee
Do I need a commissary for a food truck in Grant County?
In most cases, yes — most mobile units must operate from an approved commissary; confirm exemptions with the department. Tiered by risk level
Who issues food permits in Grant County?
Food permits here are issued by Grant County Health District. See the department site for current details.
Are city building and fire approvals separate?
Yes — building, plumbing, mechanical and fire approvals are always separate from the health permit and are often handled by different offices.