Skip to main content
foodservicenerd
Local permits & fees

Berrien County, MI Food Facility Permits & Fees

Restaurants, commercial kitchens, and food trucks.

Berrien County Health Department, Environmental Health Division · department site →
Fees change often — always confirm the current amount with the department before you budget.

Berrien County food-facility health permits run about $510–$610 annually, depending on size or sales volume. Plan review runs about $25–$300. Confirm the exact amount with Berrien County Health Department, Environmental Health Division before you budget.

Confirm the authority for your exact address. Some cities run their own health division, and building, planning, fire, sewer/grease and business-license approvals are separate even when Berrien County Health Department, Environmental Health Division issues the health permit.

The restaurant market in Berrien County

What the local foodservice landscape looks like — useful whether you’re opening here or sizing up the competition.

338
food & drink establishments
5,331
industry jobs
$120M
annual payroll
$22,601
avg wage / worker
  • 135 full-service restaurants
  • 126 limited-service & fast food
  • 23 bars & drinking places
  • 26 snack & coffee bars
  • 4 mobile food & trucks

▲ 1.8% change in establishments since 2022 (332 → 338).

The average foodservice wage here is $541 above the Michigan average ($22,060); Michigan has about 19,760 food & drink establishments statewide.

Source: U.S. Census Bureau, County Business Patterns 2023 (NAICS 722, food services & drinking places) — establishments with paid employees. Some small-county payroll figures are withheld by Census for confidentiality.

Last verified: 2026-08-17 — we re-confirmed the serving authority, its contact, and that the fees below match the current published schedule. Fee schedules may carry an earlier effective date (shown per fee); local ordinances & amendments aren’t individually reviewed, so confirm current rules with the authority having jurisdiction.See something out of date? Report an update →

Restaurant / food-facility permit

Fixed Food Service Establishment License
  • Food Service Establishment 0-100 seats $510.00
  • 101-200 seats $560.00
  • 201+ seats $610.00 (2026 Environmental Health fee schedule)

Berrien County licenses restaurants/food service establishments only; Grocery stores and other retail food establishments are licensed by the Michigan Dept; of Agriculture & Rural Development (MDARD), not the county; Change of owner during a license year is pro-rated

Plan review — required

  • $100/hour, pre-paid, 2-hour minimum (i.e
  • $200 minimum)
  • Restaurant start-up packet $25.00
  • Construction without plan review submission $300.00

Plan-review details & forms →

Reach the department

OfficeBerrien County Health Dept, Environmental Health, 2149 E Napier Ave, Benton Harbor, MI 49022

Inspection grading

Routine inspection — no public letter grade

Michigan local health departments inspect under the Michigan Food Law/FDA Food Code (priority/core violations); no letter grade or score. Reports on MDARD's online Food Inspection Postings (MiSafe).

Food truck / mobile permit

Mobile / Seasonal Food Service (STFU / Transitory Food Unit)
  • Seasonal/Mobile (Limited) $255.00
  • Mobile Food Service Commissary License $255.00
  • Transitory Food Unit (TFU) $330.00 (2026 fee schedule)

In Michigan mobile/temporary units are Special Transitory Food Units (STFU); a licensed commissary is required for mobile operations

How to apply

See the department site above.

Fees/payment and forms are on the department site; application steps vary by concept — see the checklist below.

What it costs in permit fees to open here

The government permit & plan-review fees below total roughly $790–$1,240 for Berrien County:

  • $510–$610 — food-facility permit
  • $25–$300 — plan review
  • $255–$330 — food-truck permit

That’s the paperwork only. Add buildout, equipment, deposits and licenses with the cost-to-open calculator. Fees change — confirm current amounts with the department.

Look up a restaurant’s inspection score

Check the health-inspection history and violation scores for any food establishment in Berrien County and Michigan. MDARD's MiSafe portal lets the public search state food inspection reports, with reports available from April 2022 forward.

Michigan inspection lookup →

How Berrien County’s permit cost compares

At about $510/year, Berrien County’s restaurant health permit is above the Michigan median ($372) and above the U.S. median ($125) — higher than about 98% of U.S. counties.
Ranked 47th-lowest of 63 Michigan counties by permit cost.

Comparison uses the lowest published annual restaurant-permit figure in each county; confirm your exact tier with the department.

Local food-service market

About 332 food & drinking establishments serve ~152,261 residents in Berrien County — one per ~459 residents, denser than the Michigan average (one per ~501).

U.S. Census 2023 population; County Business Patterns 2022 (NAICS 722).

Budget the permit stack

Start with ~$510 annual health permit + $25 plan review.

Plus building, fire, and business-license fees that vary locally — use the cost calculators and the checklist below to budget the full stack.

Grease trap & FOG requirements

Under Michigan Plumbing Code (based on 2021 IPC), food establishments here must control fats, oils & grease (FOG) with a grease interceptor or trap, and typically register with the local sewer/wastewater authority. Grease interceptors are required under the Michigan Plumbing Code, with FOG limits set by the local wastewater utility.

Size the interceptor with our grease-trap sizing calculator, compare units in the grease-trap catalog, and confirm the local FOG permit with Berrien County Health Department, Environmental Health Division (contact above).

Fire suppression & backflow

Hood fire suppression (Michigan Fire Code (based on 2021 IFC)): commercial cooking under a Type I hood needs a wet-chemical suppression system to NFPA 96, permitted and inspected by the local fire marshal. Commercial kitchen hood suppression follows NFPA 96 as adopted in the Michigan Fire Code, enforced by the Bureau of Fire Services and local fire departments. See do I need a hood? and the hood CFM calculator.

Backflow prevention: Restaurants must install a testable backflow preventer (typically an RPZ) that is tested annually and reported to the local water utility. A certified backflow assembly (often an RPZ) on the water service, tested annually, is standard — confirm with your water utility.

Watch out for

  • 2026 Environmental Health fee schedule figures (published PDF)
  • Temporary Food Service License $145.00; with application received <48 hrs before event $220.00; issued at event $290.00; non-profit $105.00
  • Inspection fee beyond 2nd follow-up $100.00; enforcement re-inspections $300.00
  • Restaurants = county health dept; grocery/retail food = MDARD (state)

Other food-service permits in this jurisdiction

CategoryAnnual feeNotes
Commissary / central preparation kitchen$255.00Mobile Food Service Commissary License (2026 EH fee schedule); required for mobile/STFU operations
Temporary / seasonal event$145.00Temporary Food Service License; $220.00 if application received <48 hrs before event; $290.00 issued at event; $105.00 non-profit
Pushcart / mobile vending$255.00Seasonal/Mobile (Limited) license; Transitory Food Unit (TFU) $330.00. Michigan classifies these as Special Transitory Food Units (STFU)
Grocery / market with deligrocery/retail food establishments are licensed by the Michigan Dept; of Agriculture & Rural Development (MDARD, state), not Berrien CountyBerrien County licenses restaurants/food service only; retail food (grocery) = MDARD

Equipment your Berrien County plan review will check

Health-department plan review looks for specific, code-compliant fixtures. Compare spec-filtered options, then confirm counts and sizes with your local requirements. See the full list in what equipment a commercial kitchen requires.

Nearby counties

Permit costs and rules change at the county line — compare Berrien County with its neighbors.

How to open: typical permitting sequence

This is a typical sequence — confirm the exact sequence with your authority having jurisdiction.

  1. Confirm whether Berrien County or another local jurisdiction (city/district) handles your exact address.
  2. Confirm zoning and permitted use.
  3. Prepare your menu and scaled plans.
  4. Include an equipment schedule with ANSI/NSF spec sheets.
  5. Submit water-heater and hood documentation.
  6. Pay plan-review fees.
  7. Respond to plan-check corrections.
  8. Obtain Environmental Health plan approval.
  9. Obtain building, plumbing, mechanical and fire approvals.
  10. Schedule rough-plumbing, pre-final and final health inspections.
  11. Pay the operating-permit / application fees.
  12. Receive approval before storing or preparing food.

Official plan-check requirements: plan-check guide →

Frequently asked questions

How much is a food permit in Berrien County?

Food Service Establishment 0-100 seats $510.00; 101-200 seats $560.00; 201+ seats $610.00 (2026 Environmental Health fee schedule) These are annual health-permit fees, usually tiered by seating or size; confirm your exact category with the department.

Is plan review required in Berrien County?

Yes — plan review is required before you build or remodel a food facility. Typical fees: $100/hour, pre-paid, 2-hour minimum (i.e; $200 minimum); Restaurant start-up packet $25.00; Construction without plan review submission $300.00

Do I need a commissary for a food truck in Berrien County?

In most cases, yes — most mobile units must operate from an approved commissary; confirm exemptions with the department. In Michigan mobile/temporary units are Special Transitory Food Units (STFU); a licensed commissary is required for mobile operations

Who issues food permits in Berrien County?

Food permits here are issued by Berrien County Health Department, Environmental Health Division. See the department site for current details.

Are city building and fire approvals separate?

Yes — building, plumbing, mechanical and fire approvals are always separate from the health permit and are often handled by different offices.
Sources: www.berriencounty.org · www.berriencounty.org · www.michigan.gov · observed 2026-08-07