Skip to main content
foodservicenerd
Local permits & fees

Prince George's County, MD Food Facility Permits

Restaurants and food trucks.

Prince George's County Health Department, Environmental Health (permits issued via Dept. of Permitting, Inspections & Enforcement / Momentum) · department site →
Fees change often — always confirm the current amount with the department before you budget.

Confirm the authority for your exact address. Some cities run their own health division, and building, planning, fire, sewer/grease and business-license approvals are separate even when Prince George's County Health Department, Environmental Health (permits issued via Dept. of Permitting, Inspections & Enforcement / Momentum) issues the health permit.

About 1,454 food & drinking establishments operate here, serving a population of about 947,430. (U.S. Census 2023 estimate; County Business Patterns 2022, NAICS 722)

Last verified: 2026-08-21 — we re-confirmed the serving authority, its contact, and that the fees below match the current published schedule. Fee schedules may carry an earlier effective date (shown per fee); local ordinances & amendments aren’t individually reviewed, so confirm current rules with the authority having jurisdiction.See something out of date? Report an update →

Restaurant / food-facility permit

Food Service Facility (FSF) Permit
Fee not published online — contact the department.

Permits issued by priority category: High Priority, Moderate Priority, and Low Priority Food Service Facility Permit (confirmed on Momentum food portal); Exact dollar amounts are published only in the DPIE Fee Schedule PDF (effective March 2, 2025), which is behind a Cloudflare block and could not be retrieved; New DPIE fees rose ~20% plus a 10% technology fee in 2025. Contact Food Protection Program 301-883-7690 for exact figures

Plan review — required

Fee not published online.

Reach the department

Inspection grading

How inspection results are scored/posted here is pending verification — ask the department.

Food truck / mobile permit

Mobile Food Service Facility Permit
Fee not published online — contact the department.

Separate permit categories exist for Mobile Food Service Facility, Temporary Event, and Farmers' Market Vendor/Sampler; amounts in the (inaccessible) DPIE Fee Schedule

How to apply

See the department site above.

Fees/payment and forms are on the department site; application steps vary by concept — see the checklist below.

Local food-service market

About 1,454 food & drinking establishments serve ~947,430 residents in Prince George's County — one per ~652 residents, sparser than the Maryland average (one per ~563).

U.S. Census 2023 population; County Business Patterns 2022 (NAICS 722).

Grease trap & FOG requirements

Under IPC (adopted via Maryland Building Performance Standards), food establishments here must control fats, oils & grease (FOG) with a grease interceptor or trap, and typically register with the local sewer/wastewater authority. Grease interceptors are required under Maryland's adopted plumbing code, with FOG permits issued by the local sewer/wastewater authority.

Size the interceptor with our grease-trap sizing calculator, compare units in the grease-trap catalog, and confirm the local FOG permit with Prince George's County Health Department, Environmental Health (permits issued via Dept. of Permitting, Inspections & Enforcement / Momentum) (contact above).

Fire suppression & backflow

Hood fire suppression (Maryland State Fire Prevention Code (NFPA 1 / NFPA 101)): commercial cooking under a Type I hood needs a wet-chemical suppression system to NFPA 96, permitted and inspected by the local fire marshal. Kitchen hood suppression follows NFPA 96 under the Maryland State Fire Prevention Code, enforced by the State Fire Marshal and local AHJ. See do I need a hood? and the hood CFM calculator.

Backflow prevention: Annual RPZ backflow assembly testing is required by the local water utility's cross-connection control program. A certified backflow assembly (often an RPZ) on the water service, tested annually, is standard — confirm with your water utility.

Equipment your Prince George's County plan review will check

Health-department plan review looks for specific, code-compliant fixtures. Compare spec-filtered options, then confirm counts and sizes with your local requirements. See the full list in what equipment a commercial kitchen requires.

Nearby counties

Permit costs and rules change at the county line — compare Prince George's County with its neighbors.

How to open: typical permitting sequence

This is a typical sequence — confirm the exact sequence with your authority having jurisdiction.

  1. Confirm whether Prince George's County or another local jurisdiction (city/district) handles your exact address.
  2. Confirm zoning and permitted use.
  3. Prepare your menu and scaled plans.
  4. Include an equipment schedule with ANSI/NSF spec sheets.
  5. Submit water-heater and hood documentation.
  6. Pay plan-review fees.
  7. Respond to plan-check corrections.
  8. Obtain Environmental Health plan approval.
  9. Obtain building, plumbing, mechanical and fire approvals.
  10. Schedule rough-plumbing, pre-final and final health inspections.
  11. Pay the operating-permit / application fees.
  12. Receive approval before storing or preparing food.

Frequently asked questions

Is plan review required in Prince George's County?

Yes — plan review is required before you build or remodel a food facility.

Do I need a commissary for a food truck in Prince George's County?

In most cases, yes — most mobile units must operate from an approved commissary; confirm exemptions with the department. Separate permit categories exist for Mobile Food Service Facility, Temporary Event, and Farmers' Market Vendor/Sampler; amounts in the (inaccessible) DPIE Fee Schedule

Who issues food permits in Prince George's County?

Food permits here are issued by Prince George's County Health Department, Environmental Health (permits issued via Dept. of Permitting, Inspections & Enforcement / Momentum). See the department site for current details.

Are city building and fire approvals separate?

Yes — building, plumbing, mechanical and fire approvals are always separate from the health permit and are often handled by different offices.
Sources: www.princegeorgescountymd.gov · momentumhome.princegeorgescountymd.gov · www.princegeorgescountymd.gov · observed 2026-08-21